TitleProduct

Rubber Lined Centrifugal Slurry Pump

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Hebei

  • Validity to:

    Long-term effective

  • Last update:

    2022-03-09 05:13

  • Browse the number:

    340

Send an inquiries

Company Profile

Milestone Engineering & Manufacturing Co.,Ltd

By certification [File Integrity]

Contact:mesd123(Mr.)  

Email:

Telephone:

Phone:

Area:Hebei

Address:Hebei

Website:http://www.mstpumps.com/ http://mesd123.xg-mould.com/

Product Details


Rubber Lined Centrifugal Slurry Pump

Brief Introduction

Rubber Lined Centrifugal Slurry Pumps are rubber-lined pumps handling the toughest duties in mining, pulp and paper, and pollution abatement. With its corrosion- and abrasion-resistant elastomeric liners, the rubber lined centrifugal slurry pump is specified in a variety of natural and synthetic rubbers.


Features of rubber lined centrifugal slurry pump

-Easy to adjust the space between impeller and front liner and can be removed completely when maintaining. The series pump can be installed in multistage to meet the delivery for long distance.

-High efficiency, wear-resisting, stable performance and strong interchangeability of parts.

-Applicable to transport metallurgy, mining, coal, power and other industries.


Process of centrifugal slurry pump

Sand Molding for Slurry Pump---Slurry Pump Casting---Pump Heat Treatment---Pump Part Machining---Slurry Pump Assembly---Slurry Pump Test


Shipment of centrifugal slurry pump


Parameters of rubber lined centrifugal slurry pump


FAQ

Q: How can I select a suitable pump?

A: To select a suitable pump, firstly, confirm the pumping liquid: clean water, corrosive water, waste water or slurry. Secondly, confirm the pumping parameters: CAPACIY, HEAD, SPECIFIC GRAVITY, DENSITY, ect.

Q: What power can you supply with pump?

A: We can supply the pumps powered by electric motor or diesel engine as customer's request. Please kindly confirm your local industry voltage: __V/__Hz/ 3 phase.

Q: What's your MOQ, Payment Term and Lead Time?

A: MOQ for pump: 1 SET

MOQ for spare part: 10 piece

Payment Term: T/T, L/C, Western Union, Paypal

Lead Time: in general 7 working days for slurry pumps, 15 working days for water pump

http://www.mstpumps.com/